Recent Projects

Kings Cross Underground Station Re-development project

Kings Cross Underground StationFire Resistance Subway panelling Hammersmith and City

The scope of the works required design, supply and install 2 hour fire resistance fire fighters lobby which was located in a tunnel cross passage. The design also incorporated 2 hour doorsets. FM Steel with a stainless steel type finish was successfully installed and subsequently used for a comms cabinet at the same station.

 

Kings Cross Underground Station

Kings Cross Underground StationFire Fighters Lobby & Comms Cabinet Enclosure

The scope of the works required design, supply and install 2 hour fire resistance fire fighters lobby which was located in a tunnel cross passage. The design also incorporated 2 hour doorsets. FM Blue with a stainless steel type finish was successfully installed and subsequently used for a comms cabinet at the same station.

 

Heysham & Hartlepool Nuclear Power Station

Heysham Station4-hour Hydrocarbon Fire & Flood Wall

In direct response to British Energy at Heysham, Furmanite designed, supplied and installed a fire & flood barrier. FM Blue was installed to provide a 3-hour hydrocarbon fire rating and 6Kn/M² flood resistance.

 

 

British Telecom Tunnels

pBT TunnelsFM Blue installations at locations in London, Birmingham & Manchester.

 

 

 

Victoria Station re-development

Victoria StationInstallation of various FM Blue systems.

 

 

 
Contact Us
For all enquiries, please do not hesitate to contact usphone
red button
Client Login
Firemac clients can access their documentation herephone
red button
FPAmembership_2015ASFPiso 2ifc